Sample data — the uptime figures, incident history and monthly attainment on this page are illustrative. KrewOS is not yet in service and has no operating history.
Not wired yet — arriving in slice 6.

Trust Centre · Status & uptime

One component degraded. Everything else operational.

Component and region status, uptime history and every incident we have had, including the ones that were our fault and the ones that were a model provider's. Served by the platform it reports on, which means it goes down with it — we would rather say that than let you read an uptime figure from a page that cannot report its own outage. Independent hosting is planned.

Updated every 60 seconds · 14 Aug 2026, 16:42 SGT · Availability committed at 99.9% monthly on the shared Control Plane, where the contract carries it

Overall
Partially degraded
30-day uptime
99.98%
90-day uptime
99.97%
12-month uptime
99.95%
Open incidents
1
Next maintenance
23 Aug 2026

Current component status

Singapore region
ComponentStatus30-day uptimep95 latencyNote
Control Plane — APIOperational100%86 ms—
Control Plane — StudioOperational100%142 ms—
Execution Plane — SingaporeOperational99.99%—Run queue depth normal
Model Gateway — provider ADegraded99.71%4,180 msUpstream provider latency; fallback chain engaged
Model Gateway — provider BOperational99.98%910 msAbsorbing failover traffic
KrewOS HubOperational100%74 ms—
Knowledge indexingOperational99.96%—Index lag under 30 s
Approval & notificationsOperational100%——
Audit exportOperational100%——
Billing & credit ledgerOperational100%——

Incident history

Post-mortems published within 10 business days
DateIncidentImpactDurationCauseState
14 Aug 2026Provider A inference latencyRuns on provider A slowed; fallback chain engaged automaticallyOngoingUpstream providerMonitoring
28 Jun 2026Approval notifications delayedEmail approval alerts delayed up to 46 minutes; in-app queue unaffected1h 12mOur fault — queue misconfiguration after a deployResolved
11 May 2026Knowledge indexing backlogNewly uploaded documents not retrievable for up to 2 hours; existing knowledge unaffected2h 04mOur fault — embedding worker scaling limitResolved
02 Apr 2026Provider B regional outageProfiles pinned to provider B failed over; 14 runs paused and resumed automatically38mUpstream providerResolved
19 Feb 2026Control Plane API errorsElevated 5xx on the catalogue API; running crews unaffected, Studio degraded27mOur fault — database connection exhaustionResolved
07 Jan 2026Scheduled maintenance overrunPlanned 30-minute window ran to 71 minutes; runs queued and drained without loss71mOur fault — migration slower than rehearsedResolved

Subscribe

Free

Webhooks post the same payload we use internally, including the incident identifier.

Certification milestone notices go out through this list too — including when a target date slips, which is the one worth subscribing for.

Monthly attainment, Control Plane

Committed 99.9%
MonthUptimeDowntimeIncidentsCommitment met
August 2026 (to date)100%0m0Yes
July 2026100%0m0Yes
June 202699.93%30m1Yes
May 202699.95%22m1Yes
April 202699.99%4m1Yes
March 2026100%0m0Yes
February 202699.94%27m1Yes
January 202699.84%71m1No — 10% credited

This table is the published attainment, and it is the figure the service credit below is computed from — not a summary of it. It would be measured by probes operated outside the platform, because a platform that measures its own outage will always find it shorter than you did. Those probes are not yet running, and until they are, no figure on this page has been measured at all.

Maintenance & conventions

  • 23 Aug 2026 · 02:00–03:00 SGT

    Database version upgrade. Studio read-only for up to 15 minutes; running crews continue on their pinned release.

    Scheduled
  • Standard window

    Sundays 02:00–04:00 SGT, announced at least 7 days ahead. Regulated-tier tenants may nominate an alternative window.

  • Service credits

    Issued automatically against a contract that carries the commitment, on the published schedule below. You do not have to claim them, and the January 2026 credits went out without anyone asking.

  • Whose fault it was

    Every incident row says whether the cause was ours or a provider's. Model-provider outages get blamed on us anyway; publishing the distinction is how that argument gets settled.

What a missed month is worth

The schedule is published because a commitment without a stated remedy is a sentiment. It applies to contracts that carry the availability commitment; it is not a property of every plan, and we would rather print that limit than let you assume otherwise.

Service credit schedule

Committed 99.9%One tier applies per month
Attainment in the monthService creditWhat it is
Below 99.9%, at or above 99.5%10% of the baseJanuary 2026 fell here at 99.84%
Below 99.5%, at or above 99.0%25% of the baseNever reached
Below 99.0%50% of the baseNever reached · also counts toward termination

Never more than half. Exactly one tier applies in any month, so a month's credit can never exceed half that month's base. Where a contract commits a figure other than 99.9%, the same three tiers sit at the committed figure, 0.4 points below it and 0.9 points below it — a higher commitment does not buy a breach that reaches no remedy.

Three bad months and you can leave. Served below 99.0% in any three months of a rolling twelve and you may terminate without penalty. That figure is absolute — it does not move with the figure your contract commits, and the right stands alongside the credit rather than instead of it.

What the credit is measured on

One base would pay somebody nothing. A percentage of subscription pays nothing to a firm that buys only credits; a percentage of consumption pays nothing to a firm whose subscription is most of its bill — and either collapses in exactly the month we stopped working. So the base is the greatest of three figures, never their sum.

  1. What you were charged for that month

    Spread across the period each charge funds, so an annual invoice draws a twelfth per month rather than everything in the month it was raised.

  2. What you consumed that month

    Valued at the effective rate of the lots you drew on. Under BYOK this is the smaller platform figure, because platform credits are all we ever debit you.

  3. Your usual volume before the failure

    The mean of the three months before the run of bad months began — not months the failure has already eroded.

Capped at three times the first figure, so volume from before a downsizing cannot be recovered against an invoice a fraction of its size.

It is money, not credits

The credit is applied against your next invoice. It grants no platform credits, creates no lot and carries no expiry. Paying for a broken commitment in credits that lapse before you can spend them is the appearance of a remedy rather than one.

No claim form

It is computed from the attainment published above and your own billed and metered volume, so there is nothing for you to submit and nothing for us to weigh. The month you would be chasing a claim is the month we are handling the incident.

Paid out if you leave

Any unapplied balance is discharged in cash when you leave, net of anything you then owe us, rather than lapsing. A tenant that has already gone is otherwise the one tenant a service credit pays nothing to.

The service credit is the only financial remedy for a missed availability commitment — but "only" is a statement about that commitment and nothing else. Credits consumed by a run that failed because we failed are reversed automatically on their own terms, and neither is set off against the other.

wGrow Technologies Pte Ltd · Singapore · This page is served by the KrewOS platform it reports on: if the platform is down, this page is down with it. Independent status hosting and external probes are planned and not implemented. Uptime figures on this page are illustrative.